News
The assembly of the Aerotherm installation tanks in Zielona Góra has been completed
23.11.2020
The effects of our work are already visible at the wastewater treatment plant in Zielona Góra. The assembly of the tanks in the hydrolysis and pasteurization part as well as the installations in the pasteurization part have been completed. A leakage test was also carried out in the pasteurization part. Currently, assembly works are underway in the hydrolysis section and preparation for the implementation of the control and electrical installation.